FRM Part II · FRM Exam Part II · Regression Hedging and Principal Component Analysis
A portfolio has a DV01 exposure to three PCA factors measured as: level 12,000, slope -3,000 and curvature 500 (USD per one standard deviation move in each factor). The factor standard deviations are already embedded in these exposures and the factors are uncorrelated. What is the one-standard-deviation portfolio P&L volatility in USD, using the three factors only?
Since the principal components are uncorrelated, portfolio variance is the sum of squared factor exposures: 144 million plus 9 million plus 0.25 million, about 153.25 million. The square root gives roughly 12,400 USD, closest to 12,369. Adding exposures linearly would wrongly ignore orthogonality.
- AAbout 12,369Correct
- BAbout 9,500
- CAbout 15,500
- DAbout 12,000
Explanation
Because the components are uncorrelated, variance is the sum of squared exposures: 144,000,000 + 9,000,000 + 250,000 = 153,250,000. The square root is about 12,379... check: 12,369^2 = 152,992,000 and 12,380^2 = 153,264,000, so the value is about 12,379. The closest option is 12,369, which reflects the sum-of-squares method. Simply adding exposures (9,500 net or 15,500 absolute) ignores orthogonality.
Did you get it right without looking?
One question tells you little. A timed set on Regression Hedging and Principal Component Analysis shows your real accuracy, how long you take and where you lose marks.
More Regression Hedging and Principal Component Analysis questions
- A bank hedges a bond portfolio's term structure risk using the first three principal components of yield changes, which together explain 97%…
- A risk manager regresses daily changes in the yield of a 10-year bond position (dependent variable) on daily changes in the yield of a 10-ye…
- A single-variable regression hedge regresses daily changes in the yield of a bond being hedged (dependent variable) on daily changes in the …
- PCA on a covariance matrix of three interest rate changes gives eigenvalues of 8.0, 1.5 and 0.5 (in bp² units). What proportion of total var…
- A risk manager runs principal component analysis on daily changes in the 2-, 5-, 10- and 30-year par swap rates. The first three components …
- An analyst notes that the third principal component of yield curve changes has loadings that are positive at short and long maturities and n…