FRM Part II · FRM Exam Part II · Arbitrage Pricing with Term Structure Models
A portfolio manager compares two mortgage-backed securities with the same OAS of 80 bps measured under the same calibrated model. Which conclusion is most appropriate?
Equal OAS implies both securities offer the same modeled excess return over the benchmark curve after adjusting for embedded options, provided the model is correct. It does not imply equal duration or prepayment sensitivity, since OAS is a spread, not a risk measure.
- ABoth securities must have the same effective duration
- BBoth offer the same expected excess return over the benchmark curve per the model, after adjusting for embedded options, if the model is rightCorrect
- CBoth must have identical prepayment sensitivity
- DThe one with the higher price must be cheaper relative to the curve
Explanation
OAS is the average excess return over the benchmark curve after removing option cost under the model, so equal OAS implies equal modeled compensation if the model is correct. It says nothing about duration or prepayment exposure, and price level alone does not signal cheapness.
Did you get it right without looking?
One question tells you little. A timed set on Arbitrage Pricing with Term Structure Models shows your real accuracy, how long you take and where you lose marks.
More Arbitrage Pricing with Term Structure Models questions
- A risk manager compares valuing a bond via real-world expected cash flows discounted at the risk-free rate versus risk-neutral expected cash…
- In a Vasicek model with k = 0.10 and σ = 1.2% per year, the short-rate drift in the risk-neutral measure is dr = k(θ − r)dt. The risk-neutra…
- A analyst recalibrates a binomial rate tree to a higher volatility assumption while forcing the tree to still reprice the current market zer…
- A bank uses a one-factor Vasicek model to value a zero-coupon bond. Compared with using Ho-Lee with the same σ, what is a key practical adva…
- A one-period-ahead binomial tree for the annual short rate has a current rate of 4%. After one year the rate is either 8% or 2%, with risk-n…
- A risk analyst prices a derivative on a one-period binomial interest rate tree by building a portfolio of a risky bond and cash that matches…