A portfolio manager holds a position whose DV01 is USD 50,000 and wants to hedge it using a Treasury futures contract with DV01 of USD 800 per contract. Assuming a parallel yield shift and a one-to-one yield beta, how many contracts should be traded?

Sell 62.5 contracts. The hedge ratio equals the position DV01 divided by the futures DV01, 50,000 divided by 800. The position is long duration, so the futures must be sold to offset losses when yields rise.

  1. ASell 40 contracts
  2. BSell 62.5 contractsCorrect
  3. CSell 400 contracts
  4. DBuy 62.5 contracts

Explanation

Single-instrument DV01 hedge: contracts = 50,000 / 800 = 62.5. Because the position loses value when yields rise, the hedge is a short futures position. Dividing the wrong way or using a wrong scale gives 40 or 400, and buying would double the exposure.

Did you get it right without looking?

One question tells you little. A timed set on Regression Hedging and Principal Component Analysis shows your real accuracy, how long you take and where you lose marks.

More Regression Hedging and Principal Component Analysis questions