FRM Part I · FRM Exam Part I · Multivariate Random Variables
A return X has skewness of -0.8 and kurtosis of 4.5. A hedged position is Y = -2X + 10. What are the skewness and kurtosis of Y?
Skewness of Y is +0.8 and kurtosis is 4.5. Standardized moments are unaffected by shifting and by the size of the scale factor. The negative multiplier mirrors the distribution, flipping the sign of skewness, while the even fourth power leaves kurtosis unchanged.
- ASkewness 0.8; kurtosis 4.5Correct
- BSkewness -0.8; kurtosis 4.5
- CSkewness 1.6; kurtosis 9.0
- DSkewness 0.8; kurtosis -4.5
Explanation
Skewness and kurtosis are standardized moments, so scale magnitude and the shift of 10 cancel out. A negative multiplier reverses the direction of the distribution, so skewness changes sign to +0.8. Kurtosis uses the fourth power, so it is unaffected by the sign and stays at 4.5. Multiplying by the scale factor is wrong because standardization removes it.
Did you get it right without looking?
One question tells you little. A timed set on Multivariate Random Variables shows your real accuracy, how long you take and where you lose marks.
More Multivariate Random Variables questions
- Two assets have return standard deviations of 10% and 20%, and their correlation is -0.25. A portfolio holds 60% in the first asset and 40% …
- Random variables X and Y have E[X] = 4, E[Y] = 10, Var(X) = 9, Var(Y) = 16 and Cov(X,Y) = 6. What is the variance of Z = 2X + 3Y?
- A portfolio holds 60% in asset A and 40% in asset B. Volatilities are 20% for A and 30% for B. The correlation is 0.25. What is the portfoli…
- Using the joint pmf: P(X=0,Y=1)=0.10, P(X=0,Y=2)=0.30, P(X=1,Y=1)=0.25, P(X=1,Y=2)=0.35, what is the conditional probability P(X=1 | Y=1)?
- X takes values 1 or 2 and Y takes values 10 or 20 with joint probabilities: P(1,10)=0.30, P(1,20)=0.20, P(2,10)=0.10, P(2,20)=0.40. What is …
- An analyst observes that the correlation between daily returns of two stocks is 0.80 in calm markets but the relationship becomes much stron…