FRM Part II · FRM Exam Part II · Regression Hedging and Principal Component Analysis
A trader holds a position with a DV01 of USD 50,000 per basis point. She hedges with a Treasury futures contract with a DV01 of USD 80 per contract per basis point. A regression of the position's yield changes on the hedge instrument's yield changes gives a beta of 1.20. How many futures contracts should she short to minimise variance using the regression hedge?
She should short 750 contracts. The unadjusted DV01 hedge is 50,000 divided by 80, or 625 contracts, and multiplying by the regression beta of 1.20 gives 750. Beta scales the hedge because the position's yield moves 1.2 basis points per basis point of the hedge instrument.
- A750Correct
- B625
- C520
- D900
Explanation
Regression hedge: contracts = (position DV01 / contract DV01) x beta = (50,000/80) x 1.20 = 625 x 1.2 = 750. Ignoring beta gives 625. Dividing by beta gives 520.8, about 521, which is the inverted-beta mistake. 900 would come from multiplying by beta twice (625 x 1.2 x 1.2).
Did you get it right without looking?
One question tells you little. A timed set on Regression Hedging and Principal Component Analysis shows your real accuracy, how long you take and where you lose marks.
More Regression Hedging and Principal Component Analysis questions
- A risk manager uses a two-variable regression hedge, regressing changes in a bond's yield on changes in the 2-year and 10-year swap rates, i…
- A trader holds a portfolio whose exposure to the slope factor from a PCA of the yield curve is zero, but whose exposure to the level factor …
- A bank's liability book has a DV01 of USD 50,000 and a dollar-duration hedge using a swap is put in place. Over the next month, the actual y…
- A risk analyst applies principal component analysis to historical changes in a government par-yield curve across maturities from 1 to 30 yea…
- Which is a key advantage of PCA-based hedging over a hedge based on regressions of each key rate on a single benchmark rate?
- A risk manager regresses daily changes in the yield of a 10-year bond position (dependent variable) on daily changes in the yield of a 10-ye…