Skip to content

FRM Part I · FRM Exam Part I · Hypothesis Testing

A trading desk's daily losses have a known standard deviation of USD 1 million and mean zero, with an unknown, possibly fat-tailed distribution. A risk manager wants a VaR-like loss threshold that, by Chebyshev's one- or two-sided bound applied to |loss|, is exceeded with probability at most 1%. Using the two-sided Chebyshev bound, what threshold is required, and how does it compare with the normal 99% one-tailed VaR (z = 2.33)?

The threshold is USD 10 million, far above the normal-based USD 2.33 million. Setting 1/k squared equal to 1% gives k of 10 standard deviations. Chebyshev is distribution-free and therefore very conservative compared with the normal assumption.

  1. AUSD 10 million, which is far larger than USD 2.33 millionCorrect
  2. BUSD 5 million, which is larger than USD 2.33 million
  3. CUSD 2.33 million, identical to normal VaR
  4. DUSD 100 million, because 1/k² = 1%

Explanation

Set 1/k² = 0.01, so k = 10, giving a threshold of 10 × USD 1 million = USD 10 million. The normal VaR is only USD 2.33 million, showing Chebyshev is very conservative since it assumes nothing about shape. USD 100 million wrongly sets k = 1/k².

Did you get it right without looking?

One question tells you little. A timed set on Hypothesis Testing shows your real accuracy, how long you take and where you lose marks.

More Hypothesis Testing questions