CMA Final · Strategic Cost Management · Assignment
A works manager has 5 operators and only 4 jobs, each operator can do any job, and the cost of every operator-job pair is known. Before applying the Hungarian method, what should be done to the cost matrix?
Add one dummy job column with zero costs. The matrix must be square, and the operator assigned to the dummy job is left without a real job. Zero costs mean the dummy adds no real cost, so the optimal real assignment is not distorted.
- AAdd one dummy job column with all costs equal to zeroCorrect
- BAdd one dummy job column with every cost equal to the highest cost in the matrix
- CDelete the operator with the highest total cost
- DSubtract the smallest element of the matrix from every cell
Explanation
The matrix is 5 x 4 and must be square before the Hungarian method is applied. One dummy job is added with zero costs, so the operator who gets it is simply left idle. Using the highest cost would distort the result. Deleting an operator discards valid options and may remove the optimum.
Did you get it right without looking?
One question tells you little. A timed set on Assignment shows your real accuracy, how long you take and where you lose marks.
More Assignment questions
- Three machines M1, M2 and M3 must each be given one of four jobs a, b, c, d (one job per machine, one job remains unassigned). Costs (₹ '00)…
- Three operators W1, W2 and W3 are available for four jobs J1 to J4; each operator can do only one job and one job will remain undone. Costs …
- A firm assigns three salespersons P, Q, R to three territories, one each, to maximise profit. Monthly profit in Rs. thousand for territories…
- Three workers W1, W2, W3 are available for four jobs J1 to J4, and each worker can take at most one job; one job stays unassigned. Costs (Rs…
- A firm assigns salesmen P, Q, R one each to territories X, Y, Z to maximise monthly profit (Rs thousand). Profits for X, Y, Z: P: 40, 35, 25…
- A works manager at a Pune plant must allocate 5 supervisors to 5 production lines, one supervisor per line, and wants to test every possible…