CMA Intermediate · Management Accounting · Standard Costing and Variance Analysis (Management Accounting)
Gupta Textiles Ltd budgeted fixed overheads of ₹3,60,000 for 30,000 standard hours (₹12 per hour) and 6,000 units. Actual output was 6,300 units, with actual hours worked of 31,000. Standard hours allowed per unit are 5. What is the fixed overhead volume variance?
The fixed overhead volume variance is ₹18,000 Favourable. Standard hours for actual output are 6,300 × 5 = 31,500, against budgeted 30,000 hours. The 1,500 excess hours at ₹12 per hour equal ₹18,000, favourable because output exceeded budget.
- A₹12,000 Adverse
- B₹18,000 FavourableCorrect
- C₹6,000 Favourable
- D₹24,000 Favourable
Explanation
Standard hours for actual output = 6,300 × 5 = 31,500. Volume variance = (31,500 − 30,000) × 12 = ₹18,000 Favourable. Using actual hours worked (31,000) gives ₹12,000, which is only the capacity portion and not the volume variance.
Did you get it right without looking?
One question tells you little. A timed set on Standard Costing and Variance Analysis (Management Accounting) shows your real accuracy, how long you take and where you lose marks.
More Standard Costing and Variance Analysis (Management Accounting) questions
- Which standard assumes that no allowance is made for machine breakdowns, idle time or wastage, and is therefore generally regarded as demoti…
- Iyer Metals Ltd has a standard fixed overhead rate of ₹40 per unit, based on budgeted output of 5,000 units. Actual output was 5,400 units a…
- Nair Auto standard cost per unit: 3 kg material at Rs 70 per kg. Actual output 1,000 units; material purchased 3,600 kg at Rs 72 per kg, of …
- Standard material for one unit of Vihaan Ltd is 5 kg at Rs 40 per kg. For actual output of 3,000 units, 15,900 kg were used. Material price …
- Sharma Components Ltd budgets fixed overheads of ₹6,00,000 for a month with budgeted output of 20,000 units. Actual fixed overheads incurred…
- Mehta Industries uses a standard variable overhead rate of Rs 20 per labour hour. For actual production, 2,500 standard hours were allowed, …