In a Just-in-Time (JIT) production system, which of the following best describes the primary objective of the approach?
JIT seeks to produce only what is needed, when it is needed and in the quantity needed. This pulls work through the system according to demand, cutting inventory and waste, unlike traditional systems that hold buffer stocks and run long batches.
- ABuilding up large buffer stocks to protect against supplier delays
- BProducing only what is needed, when it is needed, and in the quantity neededCorrect
- CMaximising machine utilisation by running long production batches
- DReducing the number of products to a single standard model
Explanation
JIT aims to produce and deliver items exactly when required and in the required quantity, which minimises inventory and waste. Large buffer stocks and long batches are features of traditional push systems and conflict with JIT.
Did you get it right without looking?
One question tells you little. A timed set on Lean Operations and JIT shows your real accuracy, how long you take and where you lose marks.
More Lean Operations and JIT questions
- Which of the following is a recognised feature of a JIT manufacturing environment as distinct from a traditional manufacturing environment?
- A manufacturer of auto components in Pune moves from a push system to JIT. Which of the following changes is most consistent with JIT purcha…
- Which of the following is generally identified as the eighth waste, added to the original seven wastes of the Toyota Production System?
- A Coimbatore pump manufacturer begins lean implementation by drawing a value stream map of its order-to-delivery process. The main purpose o…
- A Pune auto-components firm is introducing JIT. Which step is most consistent with JIT implementation with its suppliers?
- In a JIT system using Kanban, a production Kanban attached to a container authorises the work centre to do which of the following?