CMA Intermediate · Operations Management and Strategic Management · Lean Operations and JIT
In a Kanban-based pull production system, what normally authorises an upstream work centre to start producing a batch of parts?
Production is authorised by a Kanban card or signal released when the downstream process uses up parts. This makes upstream work replace only what has been consumed, so output follows actual demand rather than a pushed schedule or forecast, which limits overproduction and inventory.
- AA weekly master production schedule issued by the planning office
- BA Kanban card or signal released when the downstream process consumes partsCorrect
- CA forecast of next quarter's sales prepared by the marketing team
- DA supervisor's decision to keep machines busy at all times
Explanation
In a pull system the downstream process withdraws parts and the released Kanban signals the upstream centre to replenish only what was consumed. A schedule pushed from a central plan is characteristic of push systems. Forecast-driven or machine-utilisation-driven production creates the overproduction that JIT seeks to remove.
Did you get it right without looking?
One question tells you little. A timed set on Lean Operations and JIT shows your real accuracy, how long you take and where you lose marks.
More Lean Operations and JIT questions
- In a JIT system using Kanban, a production Kanban attached to a container authorises the work centre to do which of the following?
- Which of the following is a recognised feature of a JIT manufacturing environment as distinct from a traditional manufacturing environment?
- A Coimbatore pump maker's process steps and their times are: machining 20 min (value-adding), waiting for inspection 30 min, inspection 10 m…
- A manufacturer of auto components in Pune moves from a push system to JIT. Which of the following changes is most consistent with JIT purcha…
- A packaging unit in Pune produces 1,000 cartons daily against a daily demand of 700 cartons. The extra 300 cartons pile up in the warehouse …
- A plant uses a Kanban system for a part with 600 units of daily demand, container size 25 units, and 12 Kanbans in circulation, with no safe…