CMA Intermediate · Management Accounting · Activity Based Costing
In Activity Based Management (ABM), activities are classified as value-added or non-value-added from the customer's viewpoint. Which of the following activities at a Pune engineering firm would normally be classed as non-value-added?
Moving work-in-process between distant workstations is non-value-added, because it uses resources without adding anything the customer values and can be cut by better layout. Machining, assembly and painting to the customer's specification all change the product in ways the customer pays for, so they are value-added.
- AMachining a component to the customer's specification
- BAssembling the finished product
- CMoving work-in-process between two distant workstations on the shop floorCorrect
- DFinal painting of the product as specified in the customer order
Explanation
A non-value-added activity consumes resources but does not increase the product's worth to the customer. Internal material movement caused by poor layout is such an activity and can be reduced or eliminated. Machining, assembly and painting directly change the product to meet the customer's requirements, so they are value-added.
Did you get it right without looking?
One question tells you little. A timed set on Activity Based Costing shows your real accuracy, how long you take and where you lose marks.
More Activity Based Costing questions
- Gupta Textiles has a materials handling activity costing ₹5,40,000 for the year. The activity is used for 9,000 movements in the year, where…
- Sundaram Pumps Ltd has a setup cost pool of ₹2,40,000 for the year, and the cost driver is the number of machine setups. A total of 80 setup…
- Bharat Tools Ltd makes two products, X and Y. Total overheads are ₹4,20,000. Under the traditional method, overheads are absorbed on direct …
- Lakshmi Components has overheads of ₹9,00,000. Under the traditional method they are absorbed on machine hours: 30,000 in total, with Alpha …
- Rohan Engineering uses ABC. Its activity cost pool for machine setups is ₹3,20,000 and the budgeted number of setups is 400. Product Alpha h…
- Rao Electricals Ltd has overheads of ₹6,00,000, absorbed traditionally on 30,000 direct labour hours (Product M 10,000 hours, Product N 20,0…