CA Intermediate · Advanced Accounting · AS 16 Borrowing Costs
Kaveri Infra Ltd. started building a warehouse on 1 July 2025. Its general borrowings during 2025-26 were: Rs 1,00,00,000 at 10% p.a. and Rs 50,00,000 at 12% p.a., both outstanding for the whole year. No specific loan was taken. Expenditure on the warehouse was Rs 60,00,000 on 1 July 2025 and nothing further. The asset was under construction until 31 March 2026 (9 months). What amount of borrowing cost should be capitalised for 2025-26?
The capitalisable cost is Rs 4,80,000, from the weighted average rate of 10.667% applied to Rs 60,00,000 for nine months.
- ARs 4,95,000Correct
- BRs 5,40,000
- CRs 3,60,000
- DRs 6,60,000
Explanation
Weighted average capitalisation rate = (10,00,000 + 6,00,000) / 1,50,00,000 = 16,00,000/1,50,00,000 = 10.667%. Capitalised amount = 60,00,000 x 10.667% x 9/12 = Rs 4,80,000. Check: 60,00,000 x 16/150 = 6,40,000; x 0.75 = 4,80,000. So the answer is 4,80,000, which is not listed accurately; recomputed with the data, the stated option fails.
Did you get it right without looking?
One question tells you little. A timed set on AS 16 Borrowing Costs shows your real accuracy, how long you take and where you lose marks.
More AS 16 Borrowing Costs questions
- Anand Cement Ltd borrowed ₹60,00,000 at 10% p.a. on 1 April specifically to construct a storage terminal, a qualifying asset whose construct…
- Kaveri Infra Ltd. took a specific loan of Rs 50,00,000 at 10% p.a. on 1 April 2025 to construct a plant. The loan was fully drawn on that da…
- Sahyadri Infra Ltd. started constructing a bridge, a qualifying asset, on 1 April 2025 using a specific loan of Rs 1,20,00,000 at 10% p.a. A…
- Sundaram Infra Ltd is considering four items for the purpose of applying AS 16 Borrowing Costs. Which one is a qualifying asset?
- Surya Steels Ltd. took a specific term loan of ₹4,00,000 at 12% p.a. on 1 April 2025 to construct a warehouse. Construction was in progress …
- Dhanush Realty Ltd took a specific term loan of Rs 5 crore at 9% p.a. on 1 April 2025 to construct a qualifying asset. Active development wa…