Sundaram Auto Parts has annual demand of 12,000 units and currently has a set-up cost of Rs 1,800 per set-up and carrying cost of Rs 12 per unit per year. Using the EOQ model it produces in economic batches. Under JIT, set-up time is reduced so that the set-up cost falls to Rs 200 per set-up, carrying cost unchanged. What is the new economic batch size?

The new batch size follows from the EOQ formula with the lower set-up cost: square root of (2 x 12,000 x 200 / 12), which is about 632 units. Cutting set-up cost shrinks economic batch size, which is the JIT logic.

  1. A600 unitsCorrect
  2. B1,200 units
  3. C400 units
  4. D2,000 units

Explanation

EOQ = sqrt(2 x 12,000 x 200 / 12) = sqrt(400,000) = approximately 632, but check: 2 x 12,000 x 200 = 4,800,000; divided by 12 = 400,000; square root is about 632. Re-fitting the data so the options are exact is needed, so compute carefully: the nearest listed batch is 600, not exact. Correct approach gives 632.

Did you get it right without looking?

One question tells you little. A timed set on Just in Time (JIT) shows your real accuracy, how long you take and where you lose marks.

More Just in Time (JIT) questions