Tamsin Ltd's maintenance cost was $18,500 when 2,000 machine hours were worked and $24,500 when 3,000 machine hours were worked. Assuming a linear semi-variable cost, what is the estimated maintenance cost for 2,600 machine hours?

The estimated cost is $22,100. The high-low method gives a variable cost of $6 per machine hour and a fixed cost of $6,500. At 2,600 hours the cost is 6,500 plus 15,600, which equals $22,100.

  1. A$22,100Correct
  2. B$22,500
  3. C$21,700
  4. D$23,400

Explanation

Variable cost per hour = (24,500 - 18,500) / (3,000 - 2,000) = $6. Fixed cost = 18,500 - 2,000 x 6 = $6,500. Cost at 2,600 hours = 6,500 + 2,600 x 6 = 6,500 + 15,600 = $22,100. Option B results from using a wrong fixed cost figure.