Under CAS 6 (Material Cost) and general cost accounting practice, the value of scrap that is generated in a job and is NOT separately identifiable to that job, and is of small value, is usually:
Scrap not identifiable with a particular job is treated as a reduction of factory overheads, so its sale value benefits all jobs through lower overhead absorption. Only scrap traceable to a specific job is credited to that job.
- ACredited to the specific job costing sheet
- BTreated as a reduction of factory overheadsCorrect
- CAdded to direct material cost of the next job
- DIgnored and never recorded
Explanation
When scrap cannot be linked to a particular job, its realisable value is credited to the overhead pool, reducing overheads absorbed by all jobs. Crediting a specific job is for scrap traceable to that job. Adding it to the next job's materials has no basis.
Did you get it right without looking?
One question tells you little. A timed set on Job Costing shows your real accuracy, how long you take and where you lose marks.
More Job Costing questions
- In job costing, the cost of normal spoilage that arises because of the specific requirements of a particular job is generally treated as:
- In batch costing, the Economic Batch Quantity (EBQ) is the batch size that:
- Job 7 of Sundaram Tools: material Rs 60,000, labour Rs 30,000, overheads Rs 30,000, for 100 units. Inspection finds 10 abnormal spoiled unit…
- In a job costing system, which document is normally prepared first for each job and is used to accumulate the material, labour and overhead …
- In batch costing, the cost per unit of a completed batch is found by:
- Which of the following best describes a feature of job costing as applied in a custom furniture workshop in Jaipur?