Under CAS 6 (Material Cost) and general cost accounting practice, the value of scrap that is generated in a job and is NOT separately identifiable to that job, and is of small value, is usually:

Scrap not identifiable with a particular job is treated as a reduction of factory overheads, so its sale value benefits all jobs through lower overhead absorption. Only scrap traceable to a specific job is credited to that job.

  1. ACredited to the specific job costing sheet
  2. BTreated as a reduction of factory overheadsCorrect
  3. CAdded to direct material cost of the next job
  4. DIgnored and never recorded

Explanation

When scrap cannot be linked to a particular job, its realisable value is credited to the overhead pool, reducing overheads absorbed by all jobs. Crediting a specific job is for scrap traceable to that job. Adding it to the next job's materials has no basis.