CMA Intermediate · Operations Management and Strategic Management · Economics of Maintenance and Spares Management
Which cost element is generally LOWER under a preventive maintenance policy than under a pure breakdown maintenance policy, other things remaining equal?
The cost of production loss from unplanned stoppages is lower under preventive maintenance. Planned servicing reduces sudden failures, whereas inspection, scheduling and planning staff costs are additional expenses that preventive maintenance introduces.
- ACost of scheduled inspections and planned servicing
- BCost of production loss from unplanned stoppagesCorrect
- CWages of the maintenance planning staff
- DCost of maintaining a schedule of inspections
Explanation
Preventive maintenance involves planned inspections, servicing and planning staff, so these costs rise. Its benefit is fewer unplanned stoppages, so the cost of lost production falls. The other options are costs that increase under preventive maintenance.
Did you get it right without looking?
One question tells you little. A timed set on Economics of Maintenance and Spares Management shows your real accuracy, how long you take and where you lose marks.
More Economics of Maintenance and Spares Management questions
- Which of the following best describes breakdown maintenance?
- A plant at Pune has 100 identical machines. Under breakdown maintenance the expected number of breakdowns per month is 20, and each costs ₹3…
- A machine at Kaveri Plastics breaks down on average 4 times a month under breakdown maintenance, with each breakdown costing ₹6,000 in repai…
- A plant has 50 identical machines. Under breakdown maintenance, each machine fails on average 2 times a year, and each failure costs Rs 6,00…
- For a machine, the cost of a breakdown is ₹8,000 and a preventive maintenance visit costs ₹2,000 per month. Preventive maintenance is econom…
- A machine under breakdown maintenance has an expected 4 breakdowns per month, each costing Rs 5,000. A preventive maintenance programme cost…