Which of the following is a genuine feature of corrective maintenance as distinct from breakdown maintenance?
Corrective maintenance restores equipment once a fault has been detected, which can be before total failure. It is not calendar-based, which is preventive, and not driven by failure statistics to replace items early. Nor is it limited to annual shutdowns; its trigger is a detected fault.
- AIt restores equipment after a fault is detected, which may be before complete failureCorrect
- BIt is carried out only on a fixed calendar
- CIt uses statistical failure data to replace items before wear-out
- DIt is performed only during annual plant shutdowns
Explanation
Corrective maintenance is action taken to restore equipment to working condition after a fault is found, even if the equipment is still partly running. Fixed calendar work is preventive, and failure-data-based replacement is preventive or predictive. Shutdown work is a scheduling matter, not the defining feature.
Did you get it right without looking?
One question tells you little. A timed set on Economics of Maintenance and Spares Management shows your real accuracy, how long you take and where you lose marks.
More Economics of Maintenance and Spares Management questions
- Sundaram Textiles finds that a machine breakdown costs ₹12,000 per occurrence. Without preventive maintenance, expected breakdowns are 5 per…
- A textile mill uses a spare part with annual demand of 1,600 units. Ordering cost is ₹400 per order and carrying cost is ₹8 per unit per yea…
- In a replacement analysis without time value of money, a machine should be replaced when:
- Which cost element is generally LOWER under a preventive maintenance policy than under a pure breakdown maintenance policy, other things rem…
- A plant in Pune fits sensors to its turbines and schedules overhaul only when vibration and temperature readings cross set limits. Which sta…
- A textile mill in Surat replaces the bearings of its looms every 6 months according to a fixed calendar, whether or not the bearings show an…