CMA Intermediate · Cost Accounting · Job Costing
Which statement about job costing is correct?
In job costing, the profit or loss of each job can be determined separately, which helps in pricing future quotations. Costs are traced to each order, and incomplete jobs at period end appear as work in progress.
- AEach job's profit or loss can be ascertained separately, helping in pricing future quotationsCorrect
- BCosts are never traced to individual orders
- CWork in progress cannot exist at the end of a period
- DJoint products are the main cost unit
Explanation
Because costs are collected job by job, the profit or loss on each job can be found and used as a basis for future estimates. Jobs unfinished at period end form work in progress, so the claim that WIP cannot exist is wrong. Tracing costs to orders is the essence of the method.
Did you get it right without looking?
One question tells you little. A timed set on Job Costing shows your real accuracy, how long you take and where you lose marks.
More Job Costing questions
- Job 17 of Narmada Fabricators has a total cost of ₹90,000. The firm quotes a price that gives a profit of 20% on the selling price. What is …
- Which industry is the LEAST suitable for the application of job costing?
- Job No. 41 of Kaveri Engineers used direct materials of ₹24,000 and direct wages of ₹16,000. Factory overhead is absorbed at 150% of direct …
- In job costing, the cost of normal spoilage that arises because of the specific requirements of a particular job is generally treated as:
- Sharma Fabricators quoted for Job J-17: direct material ₹48,000, direct labour 300 hours at ₹120 per hour, and factory overhead absorbed at …
- In a job costing system, which document is normally prepared first for each job and is used to accumulate the material, labour and overhead …