Skip to content

IAI Actuarial Core Principles · Actuarial Mathematics for Modelling · Non-unit reserves for unit-linked contracts (zeroisation)

A unit-linked policy has non-unit reserves of Rs 40 at time 1 and Rs 30 at time 2, each per policy in force at that time. During year 2 the expected non-unit cash flow at time 2 (before interest on reserves) is -Rs 10 per policy in force at time 1. Reserves earn 5% per year, and the probability of surviving from time 1 to time 2 is 0.98. The probability that a policy in force at time 0 survives to time 1 is 0.97. What is the contribution to the profit signature at time 2 per policy in force at time 0 (to two decimal places)?

The contribution is Rs 2.52. Profit per policy in force at time 1 is 40 x 1.05 - 10 - 0.98 x 30 = 2.60, and multiplying by the 0.97 survival probability to time 1 gives 2.52.

  1. ARs 2.60
  2. BRs 1.94
  3. CRs 0.60
  4. DRs 2.00
  5. Rs 2.52Correct

Explanation

Profit per policy in force at time 1 = 40 x 1.05 - 10 - 0.98 x 30 = 42 - 10 - 29.4 = 2.60. Multiply by 0.97 for survival to time 1 to get 2.522, i.e. 2.52. Rs 2.60 omits the first-year survival. Rs 2.00 and Rs 1.94 forget the survival probability on the closing reserve. Rs 0.60 omits interest on the opening reserve.

Did you get it right without looking?

One question tells you little. A timed set on Non-unit reserves for unit-linked contracts (zeroisation) shows your real accuracy, how long you take and where you lose marks.

More Non-unit reserves for unit-linked contracts (zeroisation) questions