IAI Actuarial Core Principles · Risk Modelling and Survival Analysis · Introduction to extreme value theory
Annual maximum flood losses are modelled by a Gumbel distribution H(x) = exp(-exp(-(x - 50)/10)), with x in Rs crore. What is the probability that the annual maximum exceeds Rs 70 crore?
The probability is about 0.1266. The Gumbel distribution function at 70 is exp(-e^-2), about 0.8734, and the exceedance probability is the complement of this, 1 minus 0.8734.
- Aexp(-e^-2) ≈ 0.8734
- Be^-2 ≈ 0.1353
- C1 - exp(-e^-2) ≈ 0.1266Correct
- D1 - exp(-e^2) ≈ 0.9994
- exp(-e^2) ≈ 0.0006
Explanation
z = (70-50)/10 = 2. H(70) = exp(-e^-2) = exp(-0.1353) = 0.8734. Exceedance probability = 1 - 0.8734 = 0.1266. The value 0.8734 is the non-exceedance probability.
Did you get it right without looking?
One question tells you little. A timed set on Introduction to extreme value theory shows your real accuracy, how long you take and where you lose marks.
More Introduction to extreme value theory questions
- Annual maximum flood losses at a site are modelled by a GEV distribution with μ = 100, σ = 20 and ξ = 0 (Gumbel), in Rs crore. What is the p…
- In the peaks-over-threshold method, an analyst chooses a threshold that is set too low. What is the most likely consequence?
- X1, ..., Xn are independent Exponential variables with rate 1, and Mn is their maximum. Which statement about the limiting behaviour of Mn -…
- An analyst fits a generalised Pareto distribution (GPD) to exceedances over a threshold u using maximum likelihood. Which of the following b…
- In the Peaks over Threshold (POT) approach to extreme value theory, which statement best describes the quantity that is modelled with the Ge…
- Fire claims from a Mumbai portfolio exceed a threshold of ₹10 lakh. Exceedances are modelled by a Generalised Pareto distribution with ξ = 0…