Skip to content

CMA Intermediate · Cost Accounting · Job Costing

Job 9 at Sundaram Works was charged materials of ₹50,000, of which materials worth ₹4,000 were returned to stores, and wages of ₹30,000. Materials worth ₹6,000 left over from another job were transferred to Job 9. Factory overhead is absorbed at 80% of direct wages. Scrap from Job 9 sold for ₹2,500 is credited to the job. What is the factory cost of Job 9?

The factory cost is ₹1,03,500. Net materials are ₹52,000 after the return and the transfer in, wages are ₹30,000 and overhead is ₹24,000, totalling ₹1,06,000. Crediting the scrap sale of ₹2,500 reduces it to ₹1,03,500.

  1. A₹1,03,500Correct
  2. B₹1,06,000
  3. C₹1,04,000
  4. D₹1,01,000

Explanation

Net materials = 50,000 − 4,000 + 6,000 = 52,000. Wages = 30,000. Factory overhead = 80% × 30,000 = 24,000. Total = 1,06,000; less scrap 2,500 = 1,03,500. The option ₹1,06,000 ignores the scrap credit.

Did you get it right without looking?

One question tells you little. A timed set on Job Costing shows your real accuracy, how long you take and where you lose marks.

More Job Costing questions