ACCA Applied Skills · Performance Management · Activity-based costing
Setup costs at Delta Co total $120,000 for the period, and the cost driver is the number of machine setups. There were 400 setups in total. Product A required 25 setups in the period. What setup cost is assigned to Product A under activity-based costing?
Product A is assigned $7,500 of setup cost. The rate per setup is $120,000 divided by 400 setups, which is $300, and Product A used 25 setups, so 25 multiplied by $300 gives $7,500 under activity-based costing.
- A$3,000
- B$7,500Correct
- C$4,800
- D$30,000
Explanation
The cost driver rate is $120,000 / 400 setups = $300 per setup. Product A is assigned 25 x $300 = $7,500. $3,000 is wrong because it wrongly divides the pool by 40 instead of 400 setups, and $4,800 does not use the setup rate.
Did you get it right without looking?
One question tells you little. A timed set on Activity-based costing shows your real accuracy, how long you take and where you lose marks.
More Activity-based costing questions
- Kiln Co makes products P and Q. Overheads are: material handling $92,000 (driver: production batches) and inspection $70,000 (driver: inspec…
- Kora Co absorbs overheads using machine hours. Product X uses 2 machine hours per unit and Product Y uses 1 hour per unit. The overhead rate…
- Compared with a traditional absorption costing system that uses a single direct labour hour rate, what is the usual effect of switching to a…
- A company absorbs production overheads using a single plant-wide rate based on direct labour hours. Production is increasingly automated, an…
- Bell Co makes products X and Y. Overheads are: machining $90,000 (driver: machine hours) and setups $60,000 (driver: number of setups). Tota…
- Which statement about cost drivers in ABC is correct?