ACCA Applied Skills · Performance Management · Activity-based costing
Bell Co makes products X and Y. Overheads are: machining $90,000 (driver: machine hours) and setups $60,000 (driver: number of setups). Total machine hours are 10,000 (X 2,000; Y 8,000). Total setups are 40 (X 30; Y 10). X has 1,000 units produced and direct cost of $20 per unit. What is the full ABC cost per unit of X?
The full ABC cost per unit of X is $83. Machining adds $18,000 and setups add $45,000, giving $63,000 overhead, or $63 per unit over 1,000 units. Adding the $20 direct cost per unit gives $83.
- A$83Correct
- B$63
- C$50
- D$101
Explanation
Machining rate = $90,000 / 10,000 = $9 per hour, so X gets $18,000. Setup rate = $60,000 / 40 = $1,500, so X gets 30 x $1,500 = $45,000. Overhead is $63,000 / 1,000 = $63 per unit, plus $20 direct cost = $83. $63 omits the direct cost.
Did you get it right without looking?
One question tells you little. A timed set on Activity-based costing shows your real accuracy, how long you take and where you lose marks.
More Activity-based costing questions
- Rowan Co's order processing cost pool is $48,000 and the cost driver is the number of customer orders, of which there were 1,200 in the peri…
- In an activity-based costing system, which of the following is the most appropriate cost driver for the cost pool 'machine set-up costs'?
- A company absorbs production overheads using a single plant-wide rate based on direct labour hours. Production is increasingly automated, an…
- Setup costs at Delta Co total $120,000 for the period, and the cost driver is the number of machine setups. There were 400 setups in total. …
- Kiln Co makes products P and Q. Overheads are: material handling $92,000 (driver: production batches) and inspection $70,000 (driver: inspec…
- Kora Co absorbs overheads using machine hours. Product X uses 2 machine hours per unit and Product Y uses 1 hour per unit. The overhead rate…