CMA Final · Strategic Cost Management · Linear Programming
Sundaram Auto Components maximises profit Z = 30A + 25B (₹) subject to machine hours 2A + B ≤ 100 and labour hours A + B ≤ 80, with A, B ≥ 0. Both constraints bind at the optimum. What is the shadow price per additional machine hour?
The shadow price of a machine hour is ₹5. It is found by solving the dual conditions 2y1 + y2 = 30 and y1 + y2 = 25. One extra machine hour moves the optimum from A=20, B=60 to A=21, B=59 and raises profit from ₹2,100 to ₹2,105.
- A₹5Correct
- B₹20
- C₹25
- D₹30
Explanation
The optimum is A=20, B=60, with Z=₹2,100. The dual prices y1 (machine) and y2 (labour) solve 2y1+y2=30 and y1+y2=25, giving y1=5 and y2=20. Check: with 101 machine hours the optimum becomes A=21, B=59, so Z=2,105, a rise of ₹5. ₹20 is the labour-hour shadow price, not the machine-hour price.
Did you get it right without looking?
One question tells you little. A timed set on Linear Programming shows your real accuracy, how long you take and where you lose marks.
More Linear Programming questions
- A cattle-feed unit blends two ingredients P and Q to minimise cost C = 6p + 8q (₹ per batch). Each batch must satisfy protein 2p + q ≥ 10 an…
- Kaveri Feeds Ltd minimises cost Z = 6x + 8y (₹) subject to 2x + y ≥ 12, x + 2y ≥ 12, x + y ≥ 9 and x, y ≥ 0. At the optimal solution, what i…
- Ganga Plastics maximises profit Z = cA·A + 50B, where machine hours 3A + 2B ≤ 120 and labour hours A + 2B ≤ 80, with A, B ≥ 0. With cA = 40,…
- In a maximisation LP for Bharat Tools, the constraint x + 2y ≤ 10 for machine hours is converted to standard form for the simplex method. Wh…
- Maximise Z = c·x + 4y subject to 6x + 4y ≤ 24, x + 2y ≤ 6, x, y ≥ 0. With c = 5 the optimum is x = 3, y = 1.5. Within what range of the prof…
- A feed mix must supply at least 10 units of protein and at least 8 units of fibre. Ingredient X costs ₹6 per kg and gives 2 units of protein…