CMA Final · Strategic Cost Management · Linear Programming
Sundaram Foods maximises Z = 3x + 2y subject to x + y ≤ 4, x + 3y ≤ 6, x ≤ 3, x, y ≥ 0. Using the optimal solution, which statement is correct?
The optimum is Z = 11 at x = 3, y = 1, where x ≤ 3, x + y ≤ 4 and x + 3y ≤ 6 are all exactly satisfied, so all three bind. Other corners give only 9 or 4.
- AOptimal Z is 10, with the constraint x + 3y ≤ 6 fully used
- BOptimal Z is 11, with all three constraints binding
- COptimal Z is 9, and x ≤ 3 has slack of 1
- DOptimal Z is 10, with x ≤ 3 and x + y ≤ 4 binding and x + 3y ≤ 6 having slackCorrect
Explanation
Corners: (3,0)=9; (3,1)=11? Check feasibility: x+3y=3+3=6 ok, x+y=4 ok, so (3,1) is feasible and Z=9+2=11. Hence all three constraints bind at (3,1) and Z=11. Other corners: (0,2)=4, (3,0)=9. The correct statement is Z=11 with all constraints binding.
Did you get it right without looking?
One question tells you little. A timed set on Linear Programming shows your real accuracy, how long you take and where you lose marks.
More Linear Programming questions
- Kaveri Tools Ltd maximises Z = 50x + 40y (Rs contribution) from products A and B. The constraints are machine hours 2x + y ≤ 100, labour hou…
- In the final simplex table of a maximisation problem for Rao Textiles, the Zj - Cj entry under the slack variable of the cutting-hours const…
- A Nashik feed mill minimises cost C = 6x + 8y (₹ per unit) subject to 2x + y ≥ 12, x + 2y ≥ 12, x, y ≥ 0. What is the minimum cost?
- A cattle-feed unit blends two ingredients P and Q to minimise cost C = 6p + 8q (₹ per batch). Each batch must satisfy protein 2p + q ≥ 10 an…
- Kaveri Feeds Ltd minimises cost Z = 6x + 8y (₹) subject to 2x + y ≥ 12, x + 2y ≥ 12, x + y ≥ 9 and x, y ≥ 0. At the optimal solution, what i…
- Ganga Plastics maximises profit Z = cA·A + 50B, where machine hours 3A + 2B ≤ 120 and labour hours A + 2B ≤ 80, with A, B ≥ 0. With cA = 40,…