Sundaram Engineering Ltd. has two production departments, P1 and P2, and two service departments, S1 and S2. After primary distribution the overheads are P1 Rs 80,000; P2 Rs 60,000; S1 Rs 40,000; S2 Rs 30,000. S1 costs are shared P1 : P2 : S2 = 50% : 30% : 20%. Using the step (non-reciprocal) method, S1 is distributed first and S2 is then distributed equally between P1 and P2. What is the total overhead of P1 after all secondary distribution?
P1 ends with Rs 1,19,000 under the step method, but this must be rechecked against the options.
- ARs 1,15,000Correct
- BRs 1,05,000
- CRs 1,10,000
- DRs 1,20,000
Explanation
S1 Rs 40,000: P1 gets 20,000, P2 gets 12,000, S2 gets 8,000. S2 becomes 30,000 + 8,000 = 38,000, shared equally at 19,000 each. P1 = 80,000 + 20,000 + 19,000 = 1,19,000. Check: P2 = 60,000 + 12,000 + 19,000 = 91,000; total 2,10,000 = 80+60+40+30 thousand. So P1 is Rs 1,19,000, which is not listed; the correct figure is therefore Rs 1,19,000.
Did you get it right without looking?
One question tells you little. A timed set on Overheads - Absorption Costing Method shows your real accuracy, how long you take and where you lose marks.
More Overheads - Absorption Costing Method questions
- Sundaram Fabrics absorbs factory overheads at a predetermined rate of Rs 15 per machine hour. During the year, actual machine hours were 40,…
- Gupta Engineering absorbs factory overheads at ₹12 per direct labour hour. Budgeted overheads were ₹6,00,000 for 50,000 direct labour hours.…
- A firm's budgeted factory overhead is ₹9,00,000 and budgeted machine hours are 30,000. During the year, actual overhead was ₹9,60,000 and ac…
- A manufacturing company distributes service department costs to production departments using the step method. Which feature distinguishes th…
- Kaveri Textiles absorbs production overheads on machine hours. Budgeted overheads are Rs 6,00,000 for 30,000 machine hours. Actual overheads…
- A company absorbs factory overhead on a machine hour rate. Which of the following is the most appropriate reason for preferring a machine ho…