CMA Final · Strategic Cost Management · Learning Curve
Under a learning curve model, the learning rate is 80%. This means that:
An 80% learning rate means the cumulative average time per unit becomes 80% of its earlier level every time cumulative output doubles. It is not a reduction applied to each successive unit, and total time still rises as output increases.
- Aeach unit takes 80% of the time of the previous unit
- Bthe cumulative average time per unit falls to 80% each time cumulative output doublesCorrect
- Ctotal time falls by 80% when output doubles
- Dthe time for the first unit is 80% of standard time
Explanation
In the cumulative average model, the rate describes the fall in cumulative average time per unit when cumulative output doubles. It is not a unit-by-unit reduction, and total time does not fall.
Did you get it right without looking?
One question tells you little. A timed set on Learning Curve shows your real accuracy, how long you take and where you lose marks.
More Learning Curve questions
- Kaveri Tools makes a special die. The first unit takes 100 labour hours, and an 80% cumulative average learning curve applies. Labour costs …
- Aarav Components Ltd. expects an 80% learning curve on the cumulative average time model. The first unit of a new pump takes 100 labour hour…
- Sagar Industries has already made 4 units of a machine on an 80% cumulative average-time learning curve. The first unit took 1,000 labour ho…
- Kaveri Engineering recorded that the first unit of a job took 200 hours, and the first 4 units together took 512 hours. Assuming a cumulativ…
- Kaveri Engineering observes that the first unit of a machine took 200 hours, and the first 4 units together took 648 hours. Assuming the cum…
- Kavya Aerospace Pvt. Ltd. wins an order for 8 units. The first unit takes 1,000 hours and an 80% cumulative average curve applies. Labour is…