CMA Intermediate · Operations Management and Strategic Management · Production Planning and Control
A firm needs an annual output of 24,000 units. Machine A has fixed cost of Rs 3,00,000 per year and variable cost of Rs 20 per unit. Machine B has fixed cost of Rs 1,50,000 per year and variable cost of Rs 30 per unit. At the required output, which choice is cheaper and by how much?
Machine A is cheaper by Rs 90,000. Its total cost at 24,000 units is Rs 3,00,000 plus Rs 4,80,000, or Rs 7,80,000, while Machine B costs Rs 1,50,000 plus Rs 7,20,000, or Rs 8,70,000. Beyond the 15,000-unit crossover, the lower variable cost of A prevails.
- AMachine A cheaper by Rs 90,000Correct
- BMachine B cheaper by Rs 90,000
- CMachine A cheaper by Rs 60,000
- DMachine B cheaper by Rs 1,50,000
Explanation
Cost A = 3,00,000 + 24,000 x 20 = 7,80,000. Cost B = 1,50,000 + 24,000 x 30 = 8,70,000. A is cheaper by 90,000. Break-even is at 15,000 units (1,50,000/10), so above that A wins; the distractor naming B ignores the variable cost.
Did you get it right without looking?
One question tells you little. A timed set on Production Planning and Control shows your real accuracy, how long you take and where you lose marks.
More Production Planning and Control questions
- Which statement about capacity planning is correct?
- A plant has 2 shifts of 8 hours each per day and works 25 days a month. It has 10 machines. Effective capacity is 80% of design capacity bec…
- In a master production schedule (MPS), the 'available-to-promise' (ATP) quantity indicates:
- Product P needs 2 units of sub-assembly S, and each S needs 4 units of part T. For an order of 50 units of P, stock of S on hand is 30 units…
- In an MRP system, a component takes 2 weeks to procure and its net requirement of 400 units arises in week 8. When should the planned order …
- Which statement about Gantt charts in production control is correct?