CMA Intermediate · Operations Management and Strategic Management · Productivity Management and Quality Management
A p-chart is used to monitor the fraction defective in samples of 400 units from a Pune component line. The average fraction defective is 0.04. Using 3-sigma limits, what is the upper control limit (UCL)? (√(0.04×0.96/400) = 0.0098)
The UCL is 0.0694. For a p-chart, UCL equals the average fraction defective plus three times the standard error: 0.04 + 3 × 0.0098 = 0.0694. Sample fractions above this signal an out-of-control process.
- A0.0694
- B0.0494Correct
- C0.0098
- D0.0688
Explanation
UCL = p̄ + 3√(p̄(1−p̄)/n) = 0.04 + 3 × 0.0098 = 0.04 + 0.0294 = 0.0694. Option 0.0494 would use only 1 sigma, which is wrong. Option 0.0098 is just one standard error, and 0.0688 wrongly uses 0.0096.
Did you get it right without looking?
One question tells you little. A timed set on Productivity Management and Quality Management shows your real accuracy, how long you take and where you lose marks.
More Productivity Management and Quality Management questions
- A Pune firm reports the following annual quality costs (in ₹ lakh): quality training 4, process inspection 6, rework of defects found before…
- Which of the following correctly defines single-factor (partial) productivity of a manufacturing unit?
- A tyre manufacturer in Chennai finds that every tyre it produces meets the dimensional and material specifications in the design drawing, ye…
- A plant manager wants to separate the few defect types responsible for most customer complaints so that improvement effort is directed first…
- A quality team plots daily temperature of a furnace against the number of cracked castings on the same day to check whether the two move tog…
- The Deming Prize, the Malcolm Baldrige National Quality Award and the Rajiv Gandhi National Quality Award are best described as: