In a flow process chart, which symbol is used to represent a stage where a work-piece waits between two operations because the next machine is occupied?

The large D symbol is used. It represents an avoidable or unavoidable temporary delay, such as work waiting for an occupied machine, whereas the circle shows an operation, the square an inspection and the inverted triangle a controlled storage.

  1. ACircle
  2. BSquare
  3. CLarge DCorrect
  4. DInverted triangle

Explanation

In the ASME symbol set used in flow process charts, the large D denotes a temporary delay, such as a job waiting for a machine to become free. The circle is an operation, the square is an inspection and the inverted triangle is storage. Storage differs from delay because storage is a planned, controlled holding that requires authorisation.

Did you get it right without looking?

One question tells you little. A timed set on Control Measures - Time and Motion Study, Method Study, Work Study shows your real accuracy, how long you take and where you lose marks.

More Control Measures - Time and Motion Study, Method Study, Work Study questions