In assembly line balancing, the 'cycle time' of a line is best described as:
Cycle time is the time interval between successive units leaving the line, fixed by the required output rate. It equals available production time divided by desired output. It is not the total work content, which is the sum of all task times.
- AThe time between successive units coming off the line, set by the required output rateCorrect
- BThe sum of all task times in the product
- CThe time taken by the slowest worker to learn the task
- DThe total idle time across all workstations
Explanation
Cycle time is the maximum time available at each workstation before the product moves on, and equals available production time divided by required output. The sum of all task times is the total work content, not the cycle time.
Did you get it right without looking?
One question tells you little. A timed set on Simulation and Line Balancing shows your real accuracy, how long you take and where you lose marks.
More Simulation and Line Balancing questions
- A plant at Pune works 8 hours per day (480 minutes) and must produce 240 units per day on an assembly line. The total task time per unit is …
- Which statement about Monte Carlo simulation is correct?
- Which of the following is a recognised limitation of simulation as a decision tool?
- Under the ranked positional weight method of line balancing, how is the positional weight of a task calculated?
- A hospital in Pune builds a computer model of its outpatient clinic and runs it repeatedly with randomly generated patient arrival times to …
- A tea stall's daily demand has this distribution: 20 cups (probability 0.30), 30 cups (0.50), 40 cups (0.20). Random numbers 00-99 are assig…