CMA Intermediate · Operations Management and Strategic Management · Production Planning and Control
In line balancing for an assembly line, the sum of all task times is 54 minutes per unit and the required cycle time is 9 minutes. What is the theoretical minimum number of workstations?
The theoretical minimum is 6 workstations, found by dividing total task time of 54 minutes by the required cycle time of 9 minutes. Fewer stations would push the cycle time above 9 minutes, so the target output rate could not be met.
- A5
- B6Correct
- C7
- D9
Explanation
Theoretical minimum stations = total task time / cycle time = 54/9 = 6. Five would give a cycle time of 10.8 minutes, exceeding 9. Seven would be possible but not the minimum.
Did you get it right without looking?
One question tells you little. A timed set on Production Planning and Control shows your real accuracy, how long you take and where you lose marks.
More Production Planning and Control questions
- A firm needs an annual output of 24,000 units. Machine A has fixed cost of Rs 3,00,000 per year and variable cost of Rs 20 per unit. Machine…
- Sundaram Pumps forecasts demand of 400, 600, 800 and 600 units for four months. It follows a level plan producing the same quantity every mo…
- A plant has 2 shifts of 8 hours each per day and works 25 days a month. It has 10 machines. Effective capacity is 80% of design capacity bec…
- In a master production schedule (MPS), the 'available-to-promise' (ATP) quantity indicates:
- Which of the following is a pure 'chase' strategy in aggregate planning?
- Which of the following is a characteristic of a Just-in-Time (JIT) production system rather than a traditional push system?