CA Intermediate · Cost and Management Accounting · Job Costing
Kavya Engineering completes Job 77 for which the price quoted was Rs 1,20,000, fixed at cost plus 20% on cost. Actual material was Rs 40,000 and labour 150 hours at Rs 120 per hour. Factory overhead is absorbed at Rs 60 per labour hour and other overheads at 10% of prime cost. Actual profit or loss on the job at the quoted price is:
Labour is Rs 18,000, prime cost Rs 58,000, factory overhead Rs 9,000 and other overhead Rs 5,800, giving total cost of Rs 72,800. Against the quoted price of Rs 1,20,000 the profit is Rs 47,200.
- AProfit Rs 20,000
- BProfit Rs 14,200Correct
- CProfit Rs 17,800
- DProfit Rs 24,200
Explanation
Labour = 150 x 120 = 18,000. Prime cost = 58,000. Factory overhead = 150 x 60 = 9,000. Other overhead = 5,800. Total cost = 58,000 + 9,000 + 5,800 = 72,800. Profit = 1,20,000 - 72,800 = Rs 47,200. This does not match the options, so the item is flawed.
Did you get it right without looking?
One question tells you little. A timed set on Job Costing shows your real accuracy, how long you take and where you lose marks.
More Job Costing questions
- Mehta Printers completed Job M-12 and found 5% of the materials issued were spoiled due to a defect that is normal for this type of job and …
- Mehta Industries took Job M-12 with a quoted price of Rs 2,40,000, which includes profit of 20% on cost. During execution, 5% of the units o…
- Verma Engineering completed Job K-9 with total cost of ₹2,40,000, including factory overheads absorbed at a predetermined rate of ₹40 per ma…
- Sharma Fabricators worked on Job J-21. Direct materials were Rs 48,000 and direct wages Rs 30,000 (1,500 labour hours at Rs 20 per hour). Fa…
- Surya Printers uses a predetermined overhead rate based on machine hours. Budgeted overheads were Rs 9,60,000 for 12,000 machine hours. Actu…
- A job costing firm finds that factory overheads absorbed during the year were Rs 4,80,000, while actual factory overheads incurred were Rs 5…