FRM Part II · FRM Exam Part II · Arbitrage Pricing with Term Structure Models
A callable bond has a Z-spread of 180 bps over the spot curve. The embedded call option, valued using the term structure model, is worth 45 bps per year in spread terms. Assuming the option cost is measured consistently, what is the approximate OAS?
The OAS is about 135 bps. The Z-spread of 180 bps includes compensation for the issuer's call option worth 45 bps, so subtracting the option cost leaves the pure credit and liquidity spread. Adding it instead would be a sign error.
- A225 bps
- B135 bpsCorrect
- C180 bps
- D45 bps
Explanation
Z-spread = OAS + option cost, so OAS = 180 − 45 = 135 bps. The investor is short the call to the issuer, so part of the apparent spread compensates for the call. Adding the option cost (225) is the sign error.
Did you get it right without looking?
One question tells you little. A timed set on Arbitrage Pricing with Term Structure Models shows your real accuracy, how long you take and where you lose marks.
More Arbitrage Pricing with Term Structure Models questions
- A portfolio manager compares two mortgage-backed securities with the same OAS of 80 bps measured under the same calibrated model. Which conc…
- A bank values a mortgage-backed security with a Monte Carlo model in which prepayment depends on interest rate paths. At an OAS of 80 bps th…
- A risk analyst compares a Ho-Lee style model, where dr = λ(t)dt + σ dw, with a Cox-Ingersoll-Ross (CIR) model, where dr = k(θ − r)dt + σ√r d…
- A risk manager reviews a CIR model with k = 0.30, θ = 5%, σ = 0.12. Which conclusion about the model is correct?
- A risk analyst compares the Ho-Lee model, dr = λ(t)dt + σdw, with a model that has no time-dependent drift. Which statement about the role o…
- In the Vasicek model dr = k(θ − r)dt + σdw, the parameters are k = 0.20, θ = 5.00% and the current short rate r0 = 3.00%. Ignoring the volat…