CMA Final · Strategic Cost Management · Activity Based Cost Management
Himalaya Foods makes two products. Pool costs: ordering Rs 2,40,000 (driver: purchase orders, 800 total), and customer-support Rs 1,80,000 (driver: service calls, 600 total). Product X: 5,000 units, 300 orders, 150 calls, direct cost Rs 40 per unit. Product Y: 2,000 units, 500 orders, 450 calls, direct cost Rs 60 per unit. What is the full ABC cost per unit of Y?
Y's overhead is Rs 2,85,000 from 500 orders and 450 calls at Rs 300 each. Per unit that is Rs 142.50, and adding direct cost of Rs 60 gives Rs 202.50 per unit.
- ARs 60.00
- BRs 192.50
- CRs 195.00
- DRs 217.50Correct
Explanation
Order rate = 2,40,000/800 = Rs 300; support rate = 1,80,000/600 = Rs 300. Y overhead = 500x300 + 450x300 = 1,50,000 + 1,35,000 = Rs 2,85,000, i.e. Rs 142.50 per unit. Adding direct cost Rs 60 gives Rs 202.50? Recheck: 2,85,000/2,000 = 142.50, plus 60 = 202.50, which is not among the options, so the key is flawed.
Did you get it right without looking?
One question tells you little. A timed set on Activity Based Cost Management shows your real accuracy, how long you take and where you lose marks.
More Activity Based Cost Management questions
- Kaveri Components Ltd has a quality inspection cost pool of Rs 3,60,000 with a cost driver of number of inspections, total 1,200 inspections…
- Meera Foods Ltd has a distribution activity pool of Rs 9,00,000. The practical capacity is 6,000 deliveries, but only 4,500 deliveries are e…
- Under activity based costing, the cost of 'product design modification', which is incurred for each product line regardless of the number of…
- Under activity based management, a non-value-added activity such as rework of defective output is best handled by:
- Kaveri Textiles has a material-handling pool of Rs 4,80,000 and uses the number of material movements as the driver. Budgeted movements are …
- In an activity based costing system, which of the following is the best example of a batch-level activity?