CMA Intermediate · Operations Management and Strategic Management · Productivity Management and Quality Management
In a control chart for sample means, the centre line is 50 mm, and the standard error of the sample mean is 0.4 mm. Using 3-sigma limits, what are the upper and lower control limits?
The limits are 51.2 mm and 48.8 mm. Three-sigma control limits equal the centre line plus or minus three times the standard error of the mean: 3 × 0.4 = 1.2, so 50 + 1.2 = 51.2 and 50 − 1.2 = 48.8.
- A50.8 and 49.2
- B51.2 and 48.8Correct
- C51.2 and 49.2
- D52.0 and 48.0
Explanation
3-sigma limits are centre line ± 3 × standard error = 50 ± 3 × 0.4 = 50 ± 1.2, giving UCL 51.2 and LCL 48.8. Using 2 × 0.4 gives 50.8 and 49.2, which is wrong. Using 5 × 0.4 gives 52.0 and 48.0.
Did you get it right without looking?
One question tells you little. A timed set on Productivity Management and Quality Management shows your real accuracy, how long you take and where you lose marks.
More Productivity Management and Quality Management questions
- Which one of the following is NOT among the quality management principles on which the ISO 9000 family is based?
- A Coimbatore pump maker produced 4,000 units in March using inputs costing ₹8,00,000 in total. In April it produced 4,950 units using inputs…
- In Garvin's dimensions of quality, the 'perceived quality' dimension of a product is mainly influenced by which of the following?
- A manufacturing firm in Pune has been certified under ISO 9001 by an accredited certification body. Which statement about the certification …
- A p-chart is used to monitor the fraction defective in samples of 400 units from a Pune component line. The average fraction defective is 0.…
- A Pune firm reports the following annual quality costs (in ₹ lakh): quality training 4, process inspection 6, rework of defects found before…