In the 'Examine' stage of method study, the questioning technique is applied first to the primary questions. Which set lists the primary questions correctly?
The primary questions in the questioning technique cover purpose, place, sequence, person and means, that is, what is done, where, when, by whom and how. They challenge each recorded activity before alternatives are developed using eliminate, combine, rearrange and simplify.
- APurpose, place, sequence, person, meansCorrect
- BCost, quality, time, quantity, safety
- CSelect, record, examine, develop, install
- DEliminate, combine, rearrange, simplify, standardise
Explanation
The primary questions are about purpose, place, sequence, person and means, asking what is done, where, when, who does it and how. The answer 'Eliminate, combine, rearrange, simplify' is the set of results used in the Develop stage and not the questions. Cost and quality are not the primary question headings.
Did you get it right without looking?
One question tells you little. A timed set on Control Measures - Time and Motion Study, Method Study, Work Study shows your real accuracy, how long you take and where you lose marks.
More Control Measures - Time and Motion Study, Method Study, Work Study questions
- A time study gives a basic time of 4.00 minutes per piece for a task. The company allows relaxation and other allowances totalling 20% of th…
- In a flow process chart, the symbol of a large circle (O) denotes which activity?
- A time study analyst in a Coimbatore textile mill finds a basic time of 4.50 minutes per piece. Allowances for fatigue, personal needs and d…
- A flow process chart of the existing method at a Pune fabrication shop lists 20 activities: 8 operations, 5 transports, 3 inspections, 2 del…
- A work study engineer at a Hyderabad plant finds standard time of 6 minutes per unit. How many units should a worker produce in an 8-hour sh…
- For a packing task at a Nashik firm, the average observed time is 3.00 minutes, the operator rating is 90 on a standard of 100, and allowanc…